How long does a house extension take?

The build itself is only part of the timeline. Design and approvals come first, and getting those right is what keeps the build fast and calm. Here is a realistic breakdown for a typical extension in our area.

StageTypical duration
Design and drawings2 to 4 weeks
Planning or permitted development approval4 to 8 weeks
Building control and structural designRuns alongside the above
Single storey rear extension build10 to 16 weeks
Double storey or larger build16 to 24 weeks

Why design and build is faster

When one team designs and builds, the drawings are buildable from day one, materials are ordered early, and there is no gap where a separately drawn scheme has to be re-priced and re-planned by a contractor. That alone often saves weeks.

What can add time

  • A full planning application rather than permitted development.
  • Party wall agreements with neighbours (start these early).
  • Tricky groundworks, trees or drains discovered on site.
  • Long lead times on special items like bespoke glazing.

We give you a clear programme with your fixed quotation, so you know the milestones before we start.

Frequently asked questions

How long does a single storey extension take to build?+

Usually around 10 to 16 weeks on site once design and approvals are complete, depending on size, glazing and finish.

Can I speed it up?+

The biggest time saving is starting design and approvals early and choosing permitted development where possible. A fast-track programme with extra resource can compress the build too.

Do I need to move out?+

Usually not for a single storey extension, though the kitchen may be out of action for a period if it is a kitchen extension.

Free instant quote

Want a figure for your own project?

An indicative, itemised budget in about a minute, emailed straight to you as a branded PDF. We confirm a fixed price after a free, no-obligation site visit.

Start my free estimate

See your build cost

Free · itemised · 60 seconds

Get quote